<p><p><strong>Reference(s):</strong></p><p><em>Holtz et al. (2008)</em></p><p><strong>Method Summary</strong></p><p>QC/QA daily logs are a fundamental part of documenting construction of geosynthetic reinforced embankments. The daily logs should include a record of the placed geosynthetic geometries, as well as any issues related to construction. Digital pictures are often part of the QC/QA daily logs.</p><p><strong>Accuracy and Precision</strong></p><p>The daily logs are only as detailed and precise as the technician that records the data. Clear responsibilities of QC and QA representatives are required to ensure that all the pertinent data is recorded.</p><p><strong>Adequacy of Coverage</strong></p><p>State transportation departments currently require daily logs of both QC and QA representatives.</p><p><strong>Implementation Requirements </strong></p><p>Daily logs should already be kept by both QC and QA personnel.</p><p><strong>General Comments</strong></p><p>Daily logs are an essential part of monitoring construction of embankments over weak soils.</p></p>
Title
QC/QA Daily Logs
Technology