Deep Dynamic Compaction Cost Information
Commentary
The cost of deep dynamic compaction (DDC) is typically captured in two bid items:
- Design (for performance-based DDC project)
- Mobilization, normally lump sum
- Dynamic compaction, normally on a unit rate, either square feet or square yards
- Standby Rates
Other costs associated with DDC which may be measured and paid for separately include:
Deep Dynamic Compaction Fact Sheet
Technology Fact Sheet Deep Dynamic Compaction
Dilatometer
<p><p><strong>Reference(s):</strong></p><p><em>Dumas and Beaton (1992)</em><em>Miller et al. (2004)</em><em>Schaefer et al. (1997)</em></p><p><strong>Method Summary<br></strong>Dilatometer tests can be useful when the objective of DDC is to increase bearing capacity or reduce settlement, since they provide direct correlations to the applicable soil parameters.
Distribution Center Site, Olyphant, PA
Project Summary/Scope:
In 2021, construction began on an undeveloped parcel of land in Olyphant, Pennsylvania that was previously used for strip mining purposes associated with the coal in
JFK Airport, Queens, NY
Project Summary/Scope:
As a result of changes to the New York City Building Code (NYCBC) in 1996, seismic and liquefaction studies became more common in an area that previously had not been considered a high
Load Test
<p><p><strong>Reference(s):</strong></p><p><em>Han (1998)</em><em>Lukas (1986)</em><em>Lukas (1995)</em><em>Mitchell (1981b)</em><em>Schaefer et al.
Piezometer
<p><p><strong>Reference(s):</strong></p><p><em>Elias et al. (2006a)</em><em>Lukas (1986)</em><em>Lukas (1995)</em></p><p><strong>Method Summary<br></strong>Quick response piezometers should be used to accurately capture the large increases in porewater pressure during deep dynamic compaction.
Pressuremeter Test
<p><p><strong>Reference(s):</strong></p><p><em>Dumas and Beaton (1992)<br></em><em>Elias et al. (2006a)<br></em><em>Lukas (1986)<br></em><em>Lukas (1995)<br></em><em>Mitchell (1981b)<br></em><em>Schaefer et al. (1997)</em></p><p><strong>Method Summary<br></strong>Pressuremeter tests can be performed both before and after compaction to determine relative changes in soil properties.
Prudential Center, Newark, New Jersey
Project Summary/Scope:
The Prudential Center site encompasses an entire city block that had a varied history of uses ranging from a cemetery in the lat
Settlement Measurements
<p><p><strong>Reference(s):</strong></p><p><em>Dumas and Beaton (1992)</em><em>Elias et al. (2006a)</em><em>Lukas (1986)</em><em>Lukas (1995) </em><em>Mitchell (1981b)</em></p><p><strong>Method Summary<br></strong>Settlement measurements should be performed in a grid pattern over the area being compacted both during and after the compaction program.
Standard Penetration Test
<p><p><strong>Reference(s):<br></strong><em>Dumas and Beaton (1992)</em><em>Elias et al. (2006a)</em><em>Han (1998)</em><em>Kumar (2001)</em><em>Lukas (1986)</em><em>Lukas (1995) </em><em>Mackiewicz and Camp (2007)</em><em>Mitchell (1981b)</em><em>Schaefer et al.
Tempe Marketplace, Tempe, AZ
Project Summary/Scope:
The Tempe Marketplace property was historically used as a Municipal Solid Waste (MSW) and construction debris landfill for decades prior to the late 1990s.
Vibration Monitoring
<p><p><strong>Reference(s):</strong></p><p><em>Dumas and Beaton (1992)</em><em>Elias et al. (2006a)</em><em>Lukas (1986)</em><em>Lukas (1995)</em></p><p><strong>Method Summary<br></strong>Vibration monitoring should be performed at any nearby structures or facilities that could be damaged. These include buildings and other engineered structures such as dams, retaining walls, buried conduits, etc.