Skip to main content

Aggregate Columns Cost Information

Submitted by admin on Wed, 02/14/2018 - 22:15

<p><p><h2>Commentary</h2>The costs of aggregate columns on a highway project are typically captured in a contract bid item which is measured by the lineal foot (LF). Included in this bid item are the material, equipment, labor, and incidentals to construct an aggregate column. Mobilization associated with the installation of aggregate columns may be measured and paid for separately.<br><h2>Cost Information Summary</h2>The following table lists construction cost items that are associated with aggregate columns, along with approximate cost ranges.